Hatchip ZEISS FIB-SEM Crossbeam 350 DVIA-M1000(221109R2) 설치 보고서
DVIA-M Series
Installation Report
Hatchip
ZEISS
Crossbeam 350
FIB-SEM
DVIA-M1000
221109R2
Shenzhen
Contents
(M1000_ 221109R2 Set up)
현장 확인 항목
| Target equipment | Crossbeam 350 |
|---|---|
| Place of installation | Shenzhen |
| Remark | Good Performance |
| END USER | Hatchip Co., Ltd. |
운영자 및 일정
Operator: Lee, Young Ha
Date of setup: 23.06.14
Date of reporting: 23.06.19
Date of business trip : 17.12.27~17.12.29
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.06.14 (Wednesday)
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: Shenzhen
Equipment Model: Crossbeam 350
5.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
작성일06-14-2023
태그
DVIA-M Series
Installation Report
Hatchip
ZEISS
Crossbeam 350
FIB-SEM
DVIA-M1000
221109R2
Shenzhen


