설치 보고서
DVIA-M Series
10-26-2023

Suzhou Sko Semiconductor Sigma 300 DVIA-M1000 (221108R1) Internal Program Performance — 2023.10.26

DVIA-M Series
Installation Report
Suzhou Sko Semiconductor
Sigma 300
Suzhou
DVIA-M1000
221108R1

(M1000_ 221108R1 Set up)

Target equipmentSigma 300
Place of installationSuzhou
RemarkGood Performance
END USERSuzhou Sko Semiconductor Co., Ltd.
Operator: Park, JongwonDate of business trip : 17.12.27~17.12.29
Date of setup: 23.10.26
Date of reporting: 23.10.26

개요

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.10.26 (Thursday)

Operator: DAEIL SYSTEMS Jongwon Park

Place of measurement: Suzhou

Equipment Model: Sigma 300

M1000 internal program performance measurement result

Z축

X축

Y축

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일10-26-2023
태그
DVIA-M Series
Installation Report
Suzhou Sko Semiconductor
Sigma 300
Suzhou
DVIA-M1000
221108R1