Suzhou Sko Semiconductor Sigma 300 DVIA-M1000(221108R1) 내부 프로그램 성능 측정 — 2023.10.26
DVIA-M Series
Installation Report
Suzhou Sko Semiconductor
Sigma 300
Suzhou
DVIA-M1000
221108R1
목차
(M1000_ 221108R1 Set up)
| Target equipment | Sigma 300 |
|---|---|
| Place of installation | Suzhou |
| Remark | Good Performance |
| END USER | Suzhou Sko Semiconductor Co., Ltd. |
| Operator: Park, Jongwon | Date of business trip : 17.12.27~17.12.29 |
| Date of setup: 23.10.26 | |
| Date of reporting: 23.10.26 |
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.10.26 (Thursday)
Operator: DAEIL SYSTEMS Jongwon Park
Place of measurement: Suzhou
Equipment Model: Sigma 300
M1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
작성일10-26-2023
태그
DVIA-M Series
Installation Report
Suzhou Sko Semiconductor
Sigma 300
Suzhou
DVIA-M1000
221108R1
관련 케이스 스터디

DVIA-M Series
YIMOTECH Thermo Fisher Scientific Helios 5CX FIB-SEM DVIA-M1000 설치 보고서
07-02-2026자세히

DVIA-M Series
Suzhou Xiangcheng Enterprise Technology Hitachi SU8600 FE-SEM DVIA-M1000(240304R7) 설치 보고서
05-11-2026자세히

DVIA-M Series
YIMO Zeiss Technology(Suzhou) ZEISS EVO 10 SEM DVIA-M1000(240304R8) 설치 보고서
11-11-2025자세히