설치 보고서
DVIA-P Series
05-19-2023
Tan Kah Kee Innovation Laboratory Bonder DVIA-P7000 (221018R3) Installation Report
DVIA-P Series
Installation Report
Tan Kah Kee Innovation Laboratory
DVIA-P7000
221018R3
Bonder
Xiamen
Contents
Tan Kah Kee Innovation Laboratory (P7000_221018R3 Set up)
현장 확인 항목
| Target equipment | Bonder |
|---|---|
| Place of installation | XIAMEN |
| Remark | Good Performance |
| END USER | TAN KAH KEE INNOVATION LABORATORY |
운영자 및 일정
Operator: Lee, Young Ha
Date of setup: 23.05.17
Date of reporting: 23.05.19
Date of business trip : 17.12.27~17.12.29
개요
The DVIA-P7000 active vibration isolation platform is appropriately installed and functioning as intended. (prior to equipment installation).
Measurement date
Measurement date: 2023.05.17 (Wednesday)
Operator
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement
Place of measurement: XIAMEN
Equipment Model
Equipment Model: Bonder
측정 조건 및 결과
측정 결과 요약
Equipment is turned off
| Test Condition | VC Curves Z-axis | VC Curves X-axis | VC Curves Y-axis |
|---|---|---|---|
| Floor | D | D | C |
| Active | F | G | E |
Equipment is turned on
| Test Condition | VC Curves Z-axis | VC Curves X-axis | VC Curves Y-axis |
|---|---|---|---|
| Floor | D | D | D |
| Active | D | D | D |
Good omnidirectional performance.
P7000 internal program performance measurement result
(Equipment turn off)
P7000 내부 프로그램 — Z axis
P7000 내부 프로그램 — X axis
P7000 내부 프로그램 — Y axis
Octave Band Result
Equipment is turned off.
Octave Band Result — Equipment off — Z axis
Octave Band Result — Equipment off — X axis
Octave Band Result — Equipment off — Y axis
Equipment is turned on
Equipment on — Z axis
Equipment on — X axis
Equipment on — Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-P Series
작성일05-19-2023
태그
DVIA-P Series
Installation Report
Tan Kah Kee Innovation Laboratory
DVIA-P7000
221018R3
Bonder
Xiamen
