설치 보고서
DVIA-ULF Series
06-13-2023
Goertek Inc. Sigma300 DVIA-UB1000 (220919R6-1) Installation Report — Shanghai
DVIA-U Series
Installation Report
Goertek
Shanghai
ZEISS
Sigma300
DVIA-UB1000
DVIA-U1000
220919R6-1
목차
Goertek Inc.
Goertek Inc.
(U1000_ 220919R6-1 Set up)
현장 확인 항목
| Target equipment | Sigma300 |
|---|---|
| Place of installation | shanghai |
| Remark | Good Performance |
| END USER | Goertek Inc. |
운영자 및 일정
| Operator: Lee, Youngha Date of setup: 23.06.13 Date of reporting: 22.06.20 | Date of business trip : 17.12.27~17.12.29 |
|---|
개요
The DVIA-UB1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.06.13 (Tuesday),
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: shanghai, China
Equipment Model: Sigma300
UB1000 내부 프로그램 성능 측정 결과
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-ULF Series
작성일06-13-2023
태그
DVIA-U Series
Installation Report
Goertek
Shanghai
ZEISS
Sigma300
DVIA-UB1000
DVIA-U1000
220919R6-1
관련 케이스 스터디

DVIA-ULF Series
Goertek Inc. ZEISS Sigma 300 DVIA-U1000 (220919R6-1) Installation Report
01-07-2026자세히

DVIA-ULF Series
Shanghai NIO Automobile ZEISS Sigma300 DVIA-UB1000 (220113R2) Installation Report
07-18-2022자세히

DVIA-ULF Series
Shanghai ZEISS Sigma360 DVIA-U1000 (250114R3) Installation Report
04-18-2025자세히