본문으로 바로가기
설치 보고서
DVIA-M Series
09-19-2022

Jiangsu Modern Road & Bridge Axia ChemiSEM HiVac DVIA-M1000 (220718R3) Installation Report — Nanjing

DVIA-M Series
Installation Report
Jiangsu Modern Road & Bridge
Thermo Scientific
Axia
ChemiSEM
Nanjing
DVIA-M1000
220718R3

고객 및 설치 제목

Jiangsu Modern Road&Bridge Co., Ltd.

(江苏现代路桥有限责任公司)

(M1000_ 220718R3 Set up)

대상 장비 및 설치 장소

Target equipmentAxia ChemiSEM HiVac
Place of installationNanjing
RemarkGood Performance
END USERJiangsu Modern Road&Bridge Co., Ltd(江苏现代路桥有限责任公司)

보고 일정

Operator: Yu, Ho Sang

Date of setup: 22.09.19

Date of reporting: 22.09.20

Date of business trip : 17.12.27~17.12.29

개요

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2022.09.19 (Monday),

Operator: DAEIL SYSTEMS, Hosang Yu

Place of measurement: Nanjing

Equipment Model: Axia ChemiSEM HiVac

측정 조건 및 결과

측정 결과 요약

Test Condition

VC-Class

ZXY
FloorCDD
Above ActiveDEF

Good omnidirectional performance.

MB1000 내부 프로그램 성능 측정 결과

MB1000 내부 프로그램 — Z축

MB1000 내부 프로그램 — X축

MB1000 내부 프로그램 — Y축

옥타브 밴드 결과

옥타브 밴드 결과 — Z축

옥타브 밴드 결과 — X축

옥타브 밴드 결과 — Y축

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일09-19-2022
태그
DVIA-M Series
Installation Report
Jiangsu Modern Road & Bridge
Thermo Scientific
Axia
ChemiSEM
Nanjing
DVIA-M1000
220718R3