설치 보고서
DVIA-M Series
09-19-2022
Jiangsu Modern Road & Bridge Axia ChemiSEM HiVac DVIA-M1000 (220718R3) Installation Report — Nanjing
DVIA-M Series
Installation Report
Jiangsu Modern Road & Bridge
Thermo Scientific
Axia
ChemiSEM
Nanjing
DVIA-M1000
220718R3
목차
고객 및 설치 제목
Jiangsu Modern Road&Bridge Co., Ltd.
(江苏现代路桥有限责任公司)
(M1000_ 220718R3 Set up)
대상 장비 및 설치 장소
| Target equipment | Axia ChemiSEM HiVac |
|---|---|
| Place of installation | Nanjing |
| Remark | Good Performance |
| END USER | Jiangsu Modern Road&Bridge Co., Ltd(江苏现代路桥有限责任公司) |
보고 일정
Operator: Yu, Ho Sang
Date of setup: 22.09.19
Date of reporting: 22.09.20
Date of business trip : 17.12.27~17.12.29
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.09.19 (Monday),
Operator: DAEIL SYSTEMS, Hosang Yu
Place of measurement: Nanjing
Equipment Model: Axia ChemiSEM HiVac
측정 조건 및 결과
측정 결과 요약
Test Condition
VC-Class
| Z | X | Y | |
|---|---|---|---|
| Floor | C | D | D |
| Above Active | D | E | F |
Good omnidirectional performance.
MB1000 내부 프로그램 성능 측정 결과
MB1000 내부 프로그램 — Z축
MB1000 내부 프로그램 — X축
MB1000 내부 프로그램 — Y축
옥타브 밴드 결과
옥타브 밴드 결과 — Z축
옥타브 밴드 결과 — X축
옥타브 밴드 결과 — Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일09-19-2022
태그
DVIA-M Series
Installation Report
Jiangsu Modern Road & Bridge
Thermo Scientific
Axia
ChemiSEM
Nanjing
DVIA-M1000
220718R3
관련 케이스 스터디

DVIA-M Series
Thermo Scientific Axia DVIA-M1000 Installation Report (Jiaxing, 220106R9, 2022-06-22)
06-22-2022자세히

DVIA-M Series
LG Chem (Nanjing) ZEISS CrossBeam 550 DVIA-M1000 (231205R4) Installation Report
07-05-2024자세히
DVIA-M Series
Institute of Semiconductors (CAS) Helios G5 Langfang DVIA-M1000 Installation Report
02-06-2023자세히