본문으로 바로가기
설치 보고서
DVIA-ULF Series
03-10-2023

FUJIAN ZI JIN TONG BO Axia ChemiSEM LoVac DVIA-U1000 (220718R11) Installation Report

DVIA-ULF Series
Installation Report
FUJIAN ZI JIN TONG BO
Axia ChemiSEM
DVIA-U1000
220718R11
China

엔드 유저

Target equipmentAxia ChemiSEM LoVac
Place of installationFUJIAN
RemarkGood Performance
END USERFUJIAN ZI JIN TONG BO

운영자

Operator: Lee, Youngha Date of setup: 23.03.07 Date of reporting: 23.03.10Date of business trip : 17.12.27~17.12.29

개요

Overview The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.03.07 (Tuesday), Operator: DAEIL SYSTEMS, Youngha Lee Place of measurement: FUJIAN, China Equipment Model: Axia ChemiSEM LoVac

(U1000_ 220718R11 Set up)

U1000 내부 프로그램 성능 측정 결과

Z축

X축

Y축

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-ULF Series
작성일03-10-2023
태그
DVIA-ULF Series
Installation Report
FUJIAN ZI JIN TONG BO
Axia ChemiSEM
DVIA-U1000
220718R11
China