목차
대상 장비
-
설치 장소
1F, Shanghai Institute of Technical Physics(SITP)
비고
Good performance
END USER
Shanghai Institute of Technical Physics(SITP)
Operator: Choi, Sung Won
Date of setup : 18.12.19
Date of reporting : 18.12.26
Date of business trip : 17.12.27~17.12.29
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 2018.12.19 (Wednesday)
Operator: Daeil System, Manager Sung Won Choi
Place of measurement : 1st Floor, SITP
Equipment Model: -
| Test Condition: VC-Class | Z | X | Y |
|---|---|---|---|
| Floor | D | E | E |
| Above Active | G | G | G |
Good omnidirectional performance.
MB1000 내장 프로그램 성능 측정 결과
Z축
X축
Y축
Octave Band Result (BASE: Floor, TOP: Above Active)
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-ULF Series
작성일05-26-2026
태그
DVIA-ULF Series
Installation Report
Shanghai Institute of Technical Physics
SITP
DVIA-UB700
180927R1
Shanghai
China
관련 케이스 스터디

DVIA-ULF Series
Shanghai Institute of Technical Physics DVIA-UB700 (180927R1) Installation Report
12-26-2018자세히

DVIA-ULF Series
Shanghai Institute of Technical Physics UB700 P8 Installation Report
05-26-2026자세히

DVIA-ULF Series
ZF(China) Investment Prisma E DVIA-UB700 (220718R8) Installation Report
10-21-2022자세히