Shanghai Institute of Technical Physics DVIA-UB700 (180927R1) Installation Report

DVIA-ULF Series
Installation Report
Shanghai Institute of Technical Physics
SITP
DVIA-UB700
180927R1
Shanghai
China

대상 장비

-

설치 장소

1F, Shanghai Institute of Technical Physics(SITP)

비고

Good performance

END USER

Shanghai Institute of Technical Physics(SITP)

Operator: Choi, Sung Won

Date of setup : 18.12.19

Date of reporting : 18.12.26

Date of business trip : 17.12.27~17.12.29

개요

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 2018.12.19 (Wednesday)

Operator: Daeil System, Manager Sung Won Choi

Place of measurement : 1st Floor, SITP

Equipment Model: -

Test Condition: VC-ClassZXY
FloorDEE
Above ActiveGGG

Good omnidirectional performance.

MB1000 내장 프로그램 성능 측정 결과

Z축

X축

Y축

Octave Band Result (BASE: Floor, TOP: Above Active)

Z축

X축

Y축

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-ULF Series
작성일05-26-2026
태그
DVIA-ULF Series
Installation Report
Shanghai Institute of Technical Physics
SITP
DVIA-UB700
180927R1
Shanghai
China