설치 보고서
DVIA-ULF Series
12-26-2018

Shanghai Institute of Technical Physics DVIA-UB700 (180927R1) Installation Report

DVIA-ULF Series
Installation Report
Shanghai Institute of Technical Physics
SITP
DVIA-UB700
180927R1
Shanghai
China

대상 장비

-

설치 장소

1F, Shanghai Institute of Technical Physics(SITP)

비고

Good performance

최종 사용자

Shanghai Institute of Technical Physics(SITP)

작업자

Operator: Choi, Sung Won Date of setup : 18.12.19 Date of reporting : 18.12.26

Date of business trip : 17.12.27~17.12.29

개요

Overview After Active mounting, measure the vibration environment to check that there is no problem in using the equipment. Measurement date: 2018.12.19 (Wednesday), Operator: Daeil System, Manager Sung Won Choi Place of measurement : 1st Floor, SITP Equipment Model: - Measurement conditions and results Summary of measurement results Good omnidirectional performance.

Test ConditionVC-Class
ZX
FloorDE
Above ActiveGG

MB1000 내장 프로그램 성능 측정 결과

Z축 MB1000 내장 프로그램

X축 MB1000 내장 프로그램

Y축 MB1000 내장 프로그램

옥타브 대역 결과 (BASE: Floor, TOP: Above Active)

Z축 옥타브 대역 (Floor 대 Above Active)

X축 옥타브 대역 (Floor 대 Above Active)

Y축 옥타브 대역 (Floor 대 Above Active)

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-ULF Series
작성일12-26-2018
태그
DVIA-ULF Series
Installation Report
Shanghai Institute of Technical Physics
SITP
DVIA-UB700
180927R1
Shanghai
China