FUJIAN ZI JIN TONG BO Axia ChemiSEM LoVac DVIA-U1000(220718R11) 설치 보고서 — 푸젠
DVIA-U Series
Installation Report
FUJIAN ZI JIN TONG BO
Thermo Scientific
Axia
ChemiSEM
LoVac
Fujian
DVIA-U1000
220718R11
목차
FUJIAN ZI JIN TONG BO
FUJIAN ZI JIN TONG BO
(U1000_ 220718R11 Set up)
현장 확인 항목
| Target equipment | Axia ChemiSEM LoVac |
|---|---|
| Place of installation | FUJIAN |
| Remark | Good Performance |
| END USER | FUJIAN ZI JIN TONG BO |
운영자 및 일정
| Operator: Lee, Youngha Date of setup: 23.03.07 Date of reporting: 23.03.10 | Date of business trip : 17.12.27~17.12.29 |
|---|
개요
The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.03.07 (Tuesday), Operator: DAEIL SYSTEMS, Youngha Lee Place of measurement: FUJIAN, China Equipment Model: Axia ChemiSEM LoVac
U1000 내부 프로그램 성능 측정 결과
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
작성일03-10-2023
태그
DVIA-U Series
Installation Report
FUJIAN ZI JIN TONG BO
Thermo Scientific
Axia
ChemiSEM
LoVac
Fujian
DVIA-U1000
220718R11


