설치 현장 사진
개요
| Target equipment | TBD |
|---|---|
| Place of installation | SHANGHAI |
| Remark | Good Performance |
| END USER | ShanghaiTech University |
Operator: Lee, Sang Jae
Date of setup: 22.12.19
Date of reporting: 22.12.28
Date of business trip : 17.12.27~17.12.29
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.12.19 (Monday),
Operator: DAEIL SYSTEMS, Sangjae Lee
Place of measurement: SHANGHAI
Equipment Model: TBD
Serial number: 220628R2
MB1000 내부 프로그램 성능 측정 결과
Z축
X축
Y축