설치 보고서
DVIA-M Series
07-05-2024

DVIA-M1000 Internal Program Measurement (230821R3-1)

DVIA-M Series
Installation Report
DVIA-M1000
230821R3-1
Internal program
MB1000

보고 요약

Target equipment: N/A

Place of installation: N/A

Remark: Good Performance

END USER: N/A

(M1000_ 230821R3-1 Set-up)

개요

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2024.03.18(Monday)

Operator: Chaewon Lee from DAEIL SYSTEMS

Place of measurement: N/A

Equipment Model: N/A

Operator: Chaewon Lee

Date of setup: 24.03.18

Date of reporting: 24.07.05

Date of business trip : 17.12.27~17.12.29

MB1000 internal program performance measurement result

수직

좌우

전후