본문으로 바로가기
설치 보고서
07-21-2022

GRINM 재료재생 이용기술 Zeiss EVO15 DVIA-U1000(220603R1) 설치 보고서 — 베이징

DVIA-U Series
Installation Report
GRINM
Beijing
Zeiss
EVO15
DVIA-U1000
220603R1

GRINM Resources and Environment Tech. Co., Ltd.(北京有色金属研究院)

GRINM Resources and Environment Tech. Co., Ltd.(北京有色金属研究院)

(U1000_ 220603R1 Set up)

현장 확인 항목

Target equipmentZeiss EVO15
Place of installationBEIJING
RemarkGood Performance
END USERGRINM Resources and Environment Tech. Co., Ltd.(北京有色金属研究院)

운영자 및 일정

Operator: Lee, Youngha Date of setup : 22.07.20 Date of reporting : 22.07.21Date of business trip : 17.12.27~17.12.29

개요

Overview The DVIA-UB1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2022.07.20 (Wednesday), Operator: DAEIL SYSTEMS, Youngha Lee Place of measurement: BEIJING, China Equipment Model: Zeiss EVO15 Measurement conditions and results Summary of measurement results Good omnidirectional performance.

UB1000 내부 프로그램 성능 측정 결과

Z축

X축

Y축

옥타브 밴드 결과

Z축 (옥타브 밴드)

X축 (옥타브 밴드)

Y축 (옥타브 밴드)

Active Off

Active On

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
작성일07-21-2022
태그
DVIA-U Series
Installation Report
GRINM
Beijing
Zeiss
EVO15
DVIA-U1000
220603R1