설치 보고서
DVIA-ULF Series
01-31-2023
China Electric Power Research Institute Sigma500 DVIA-U1000 (220512R4) Installation Report — Beijing
DVIA-U Series
Installation Report
China Electric Power Research Institute
CEPRI
Sigma500
Beijing
DVIA-U1000
220512R4
목차
CHINA ELECTRIC POWER RESEARCH INSTITUTE
CHINA ELECTRIC POWER RESEARCH INSTITUTE
(U1000_ 220512R4 Set up)
현장 확인 항목
| Target equipment | Sigma500 |
|---|---|
| Place of installation | Beijing |
| Remark | Good Performance |
| END USER | CHINA ELECTRIC POWER RESEARCH INSTITUTE |
운영자 및 일정
| Operator: Lee, Youngha Date of setup: 23.01.31 Date of reporting: 23.01.31 | Date of business trip : 17.12.27~17.12.29 |
|---|
개요
The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.01.31 (Tuesday), Operator: DAEIL SYSTEMS, Youngha Lee Place of measurement: Beijing, China Equipment Model: Sigma500
U1000 내부 프로그램 성능 측정 결과
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-ULF Series
작성일01-31-2023
태그
DVIA-U Series
Installation Report
China Electric Power Research Institute
CEPRI
Sigma500
Beijing
DVIA-U1000
220512R4
관련 케이스 스터디

DVIA-ULF Series
China Electric Power Research Institute Sigma500 DVIA-UB700 (220512R4) Installation Report — Beijing
01-31-2023자세히

DVIA-ULF Series
DongFang Boiler (Group) Co., Ltd. Sigma500 DVIA-U1000 (230512R4) Installation Report — Chengdu
07-06-2023자세히

DVIA-ULF Series
GRINM Zeiss EVO15 DVIA-U1000 (220603R1) Installation Report — Beijing
07-21-2022자세히