DongFang Boiler (Group) Co., Ltd. Sigma500 DVIA-U1000(230512R4) 설치 보고서 — 청두
DVIA-U Series
Installation Report
DongFang Boiler
Sigma500
Chengdu
DVIA-U1000
230512R4
목차
DongFang Boiler (Group) Co., Ltd.
DongFang Boiler (Group) Co., Ltd.
(U1000_ 230512R4 Set up)
현장 확인 항목
| Target equipment | Sigma500 |
|---|---|
| Place of installation | CHENGDU |
| Remark | Good Performance |
| END USER | DongFang Boiler (Group) Co., Ltd. |
운영자 및 일정
| Operator: Lee, Youngha Date of setup: 23.07.05Date of reporting: 23.07.06 | Date of business trip : 17.12.27~17.12.29 |
|---|
개요
The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.07.05 (Wednesday),
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: CHENGDU, China
Equipment Model: Sigma500
U1000 내부 프로그램 성능 측정 결과
Z축
X축
Y축