DongFang Boiler (Group) Co., Ltd. Sigma500 DVIA-U1000 (230512R4) Installation Report — Chengdu

DVIA-U Series
Installation Report
DongFang Boiler
Sigma500
Chengdu
DVIA-U1000
230512R4

DongFang Boiler (Group) Co., Ltd.

DongFang Boiler (Group) Co., Ltd.

(U1000_ 230512R4 Set up)

현장 확인 항목

Target equipmentSigma500
Place of installationCHENGDU
RemarkGood Performance
END USERDongFang Boiler (Group) Co., Ltd.

운영자 및 일정

Operator: Lee, Youngha Date of setup: 23.07.05Date of reporting: 23.07.06Date of business trip : 17.12.27~17.12.29

개요

The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.07.05 (Wednesday),

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: CHENGDU, China

Equipment Model: Sigma500

U1000 내부 프로그램 성능 측정 결과

Z축

X축

Y축