설치 보고서
DVIA-M Series
12-13-2022
BTRCHINA GeminiSEM 460 DVIA-M1000 (220422R1) Internal Program Performance — Shenzhen — 2022.12.13
DVIA-M Series
Installation Report
BTRCHINA
GeminiSEM 460
Shenzhen
DVIA-M1000
220422R1
목차
(M1000_ 220422R1 Set up)
| Target equipment | GeminiSEM460 |
|---|---|
| Place of installation | SHENZHEN |
| Remark | Good Performance |
| END USER | BTRCHINA |
| Operator: Lee, Young Ha | Date of business trip : 17.12.27~17.12.29 |
| Date of setup: 22.12.13 | |
| Date of reporting: 22.12.29 |
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.12.13 (Tuesday),
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: SHENZHEN
Equipment Model: GeminiSEM460
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일12-13-2022
태그
DVIA-M Series
Installation Report
BTRCHINA
GeminiSEM 460
Shenzhen
DVIA-M1000
220422R1
관련 케이스 스터디

DVIA-M Series
TESCAN SOLARIS GMH DVIA-M1000 (230501R3-1) Installation Report
05-15-2026자세히

DVIA-M Series
PXW ZEISS GeminiSEM560 DVIA-M1000 (230525R8) Installation Report
05-15-2026자세히

DVIA-M Series
Peking University Shenzhen Graduate School Thermo Fisher Helios 5 CX FIB-SEM DVIA-M1000 (250613R3) Installation Report
11-11-2025자세히