본문으로 바로가기
설치 보고서
DVIA-M Series
05-19-2022

ZEISS Gemini Crossbeam 350 DVIA-M1000 Installation Report (JuCan Optoelectronics, Suqian, 220106R5, 2022)

DVIA-M Series
Installation Report
DVIA-M1000
ZEISS
Gemini Crossbeam 350
JuCan Optoelectronics
Suqian
220106R5

설치 사진

Target equipment

ZEISS Gemini Crossbeam 350

Place of installation

SUQIAN, 1F

Remark

Good Performance

END USER

JuCan Optoelectronics(聚灿光电)

Operator: Cheon, Seoung Hoon

Date of setup : 22.05.16

Date of reporting : 22.05.19

Date of business trip : 17.12.27~17.12.29

개요

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2022.05.16 (Monday),

Operator: Daeil System, SeoungHoon Cheon

Place of measurement: SUQIAN, 1F

Equipment Model: ZEISS Gemini Crossbeam 350

측정 조건 및 결과

측정 결과 요약

Test Condition

VC-Class

ZXY
FloorBDD
Above ActiveFDD

Good omnidirectional performance.

MB1000 internal program performance measurement result

내부 프로그램 — Z축

내부 프로그램 — X축

내부 프로그램 — Y축

Octave Band Result

옥타브 밴드 — Z축

옥타브 밴드 — X축

옥타브 밴드 — Y축

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일05-19-2022
태그
DVIA-M Series
Installation Report
DVIA-M1000
ZEISS
Gemini Crossbeam 350
JuCan Optoelectronics
Suqian
220106R5