설치 보고서
DVIA-M Series
12-29-2021
Baosteel ZEISS Sigma 300 DVIA-MB1000 (P205) Internal Program Performance — 2021.12.29
DVIA-M Series
Installation Report
Baosteel
ZEISS
Sigma 300
DVIA-MB1000
P205
MB1000
목차
(MB1000 P205 Set up)
| Target equipment | ZEISS-Sigma300 |
|---|---|
| Place of installation | R&D Center 3Floor |
| Remark | Good Performance |
| END USER | BAOSTELL |
| Operator: Choi, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 21.12.29 | Date of reporting : 21.12.29 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
측정 일자
Measurement date: 21.12.29 (wed)
Operator
Operator: Daeil System, Research engineer Choi, HyoungMun
측정 장소
Place of measurement : R&D Center 3Floor
Equipment Model
Equipment Model: ZEISS-Sigma300
측정 조건 및 결과
측정 결과 요약
| 시험 조건 | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -23 dB | -40 dB | -40 dB |
| X | -27 dB | -32 dB | -35 dB |
| Y | -30 dB | -41 dB | -40 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일12-29-2021
태그
DVIA-M Series
Installation Report
Baosteel
ZEISS
Sigma 300
DVIA-MB1000
P205
MB1000
관련 케이스 스터디

DVIA-M Series
BAOSTELL R&D Center ZEISS Sigma 300 DVIA-MB1000 (P205 YIMO 201116R2) Internal Program Performance — 2020.12.15
12-15-2020자세히

DVIA-M Series
ZEISS Sigma 300 DVIA-MB1000 (210503R7) YIMO internal program — 2022-01-07
01-07-2022자세히

DVIA-M Series
ZEISS Sigma 300 DVIA-MB1000 (P227 / 210503R7) NEMO worksheet — 2022-01-07
01-07-2022자세히