설치 보고서
DVIA-M Series
10-28-2021
SILAN ZEISS CROSSBEAN350 MB1000 P250 DVIA-MB1000 Internal Program Performance — SN 210812R2 — 2021.10.28
DVIA-M Series
Installation Report
SILAN
ZEISS
CROSSBEAN350
DVIA-MB1000
MB1000
210812R2
Internal Program
목차
MB1000 P250 210812R2
| Target equipment | ZEISS CROSSBEAN350 |
|---|---|
| Place of installation | SILAN |
| Remark | Good Performance |
| END USER | SILAN |
Operator: Choi, HyoungMun
Date of setup : 21.10.28
Date of reporting : 21.10.28
Date of business trip : 17.12.27~17.12.29
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.10.28 (THU)
Operator: Daeil System, Research engineer Choi, HyoungMun
Place of measurement : SILAN
Equipment Model: ZEISS CROSSBEAN350
측정 조건 및 결과
측정 결과 요약
Transmissibility
| Test Condition | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -27 dB | -33 dB | -32 dB |
| X | -35 dB | -32 dB | -39 dB |
| Y | -32 dB | -38 dB | -40 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일10-28-2021
태그
DVIA-M Series
Installation Report
SILAN
ZEISS
CROSSBEAN350
DVIA-MB1000
MB1000
210812R2
Internal Program
관련 케이스 스터디

DVIA-M Series
YIMO SILAN ZEISS CROSSBEAN350 MB1000 P250 DVIA-MB1000 Internal Program — SN 210812R2 — 2021.10.28
10-29-2021자세히

DVIA-M Series
ZEISS-Gemini DVIA-MB1000 MB1000 P197 (200928R2) Internal Program Performance — 2021.03.15
03-15-2021자세히

DVIA-M Series
ZEISS Sigma 300 DVIA-MB1000 (210503R7) YIMO internal program — 2022-01-07
01-07-2022자세히