본문으로 바로가기
설치 보고서
DVIA-M Series
08-05-2022

Ningbo Institute of materials ZEISS GEMINI300 DVIA-M1000 (210714R2-2) Installation Report — 2022.08.05

DVIA-M Series
Installation Report
Ningbo Institute of materials
ZEISS
GEMINI300
SEM
DVIA-M1000
210714R2-2

Ningbo Institute of materials(宁波材料所)

(M1000_ 210714R2-2 Set up)

Target equipmentZEISS GEMINI300
Place of installationBINZHOU
RemarkGood Performance
END USERNingbo Institute of materials(宁波材料所)
Operator: Lee, Young ha
Date of setup: 22.08.04
Date of reporting: 22.08.05
Date of business trip : 17.12.27~17.12.29

개요

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

측정 일자

Measurement date: 2022.08.04 (Thursday),

담당자

Operator: DAEIL SYSTEMS, Youngha Lee

측정 장소

Place of measurement: BINZHOU

장비 모델

Equipment Model: ZEISS GEMINI300

측정 조건 및 결과

측정 결과 요약

Test Condition

VC-Class

ZXY
FloorBEE
Above ActiveGFF

Good omnidirectional performance.

MB1000 내부 프로그램 성능 측정 결과

MB1000 내부 프로그램 — Z축

MB1000 내부 프로그램 — X축

MB1000 내부 프로그램 — Y축

옥타브 밴드 결과

옥타브 밴드 결과 — Z축

옥타브 밴드 결과 — X축

옥타브 밴드 결과 — Y축

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일08-05-2022
태그
DVIA-M Series
Installation Report
Ningbo Institute of materials
ZEISS
GEMINI300
SEM
DVIA-M1000
210714R2-2