Wenzhou Hongfeng ZEISS GeminiSEM 300 Wenzhou DVIA-M1000 Installation Report (210714R2-1, 2022-05-18)

DVIA-M Series
Installation Report
Wenzhou Hongfeng
WENZHOU
DVIA-M1000
ZEISS
GeminiSEM 300
210714R2-1

Wenzhou Hongfeng Electrical Alloy Co., Ltd.

(M1000_ 210714R2-1 Set up)

현장 확인 항목

Target equipmentZEISS GeminiSEM300
Place of installationWENZHOU, 3F
RemarkGood Performance
END USER温州宏丰电工合金股份有限公司

운영자 및 일정

Operator: Kim, Sung kuk

Date of setup : 22.05.18

Date of reporting : 22.05.19

Date of business trip : 17.12.27~17.12.29

개요

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2022.05.18 (Wednesday),

Operator: DAEIL SYSTEMS, SungKuk Kim

Place of measurement: WENZHOU, 3F

Equipment Model: ZEISS GeminiSEM 300

측정 조건 및 결과

측정 결과 요약

ZXY
FloorBBB
Above ActiveFEE

Good omnidirectional performance.

MB1000 internal program performance measurement result

MB1000 internal program — Z axis

MB1000 internal program — X axis

MB1000 internal program — Y axis

Octave Band Result

Octave Band Result — Z axis

Octave Band Result — X axis

Octave Band Result — Y axis

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일05-18-2022
태그
DVIA-M Series
Installation Report
Wenzhou Hongfeng
WENZHOU
DVIA-M1000
ZEISS
GeminiSEM 300
210714R2-1