본문으로 바로가기
설치 보고서
DVIA-M Series
09-06-2021

YIMO MB1000 P246 (210701R6-5) internal program worksheet — 2021.09.06

DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
210701R6-5
P246

(MB1000 P246 210701R6-5 Set up)

Target equipment

N/A

Place of installation

N/A

Remark

Good Performance

END USER

N/A

Operator

Operator: Choi, HyoungMun

Date of setup

Date of setup : 21.08.27

Date of reporting

Date of reporting : 21.09.06

Date of business trip

Date of business trip : 17.12.27~17.12.29

개요

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

측정 일자

Measurement date: 21.08.25 (WED)

Operator: Daeil System, Research engineer Choi, HyoungMun

측정 장소

Place of measurement : N/A

Equipment Model

Equipment Model: N/A

측정 조건 및 결과

측정 결과 요약

테스트 조건2 Hz5 Hz10 Hz
Z-28 dB-36 dB-34 dB
X-31 dB-40 dB-33 dB
Y-30 dB-42 dB-32 dB

Good omnidirectional performance.

MO1000 내부 프로그램 성능 측정 결과

Z axis

X axis

Y axis

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일09-06-2021
태그
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
210701R6-5
P246