설치 보고서
DVIA-M Series
09-06-2021
YIMO MB1000 P246 (210701R6-5) internal program worksheet — 2021.09.06
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
210701R6-5
P246
목차
(MB1000 P246 210701R6-5 Set up)
Target equipment
N/A
Place of installation
N/A
Remark
Good Performance
END USER
N/A
Operator
Operator: Choi, HyoungMun
Date of setup
Date of setup : 21.08.27
Date of reporting
Date of reporting : 21.09.06
Date of business trip
Date of business trip : 17.12.27~17.12.29
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
측정 일자
Measurement date: 21.08.25 (WED)
Operator: Daeil System, Research engineer Choi, HyoungMun
측정 장소
Place of measurement : N/A
Equipment Model
Equipment Model: N/A
측정 조건 및 결과
측정 결과 요약
| 테스트 조건 | 2 Hz | 5 Hz | 10 Hz | ||
|---|---|---|---|---|---|
| Z | -28 dB | -36 dB | -34 dB | ||
| X | -31 dB | -40 dB | -33 dB | ||
| Y | -30 dB | -42 dB | -32 dB | ||
Good omnidirectional performance.
MO1000 내부 프로그램 성능 측정 결과
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일09-06-2021
태그
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
210701R6-5
P246
관련 케이스 스터디

DVIA-M Series
YIMO Ningde era Thermo Fisher Apreo 2S DVIA-MB1000 (240103R5) Installation Report
05-11-2026자세히

DVIA-M Series
YIMO Allide (Shanghai) Hitachi SU8600 FE-SEM DVIA-MB1000 (240103R6) Installation Report
05-11-2026자세히

DVIA-M Series
YIMO Anhui University Thermo Fisher Hellos 5 UC DVIA-MB1000 (240119R4-1) Installation Report
05-11-2026자세히