본문으로 바로가기
설치 보고서
DVIA-M Series
05-12-2021

Visionox (Guangzhou) Thermo Fisher Scientific Helios 5 CX DVIA-MB1000 (210524R4) Installation Report — 2021.05.12

DVIA-M Series
Installation Report
Visionox
Guangzhou
DVIA-MB1000
210524R4
Helios 5 CX
Thermo Fisher Scientific

Visionox (광저우)

Visionox (Guangzhou)

(MB1000 P232 210524R4)

현장 확인 항목

Target equipmentTHERMO SCIENTIFIC-HELIOS 5 CX
Place of installationVisionox (Guangzhou)
RemarkGood Performance
END USERVisionox (Guangzhou)

운영자 및 일정

Operator: Choi, HyoungMun

Date of setup : 21.05.10

Date of reporting : 21.05.12

Date of business trip : 17.12.27~17.12.29

개요

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 21.06.23 (TUE)

Operator: Daeil System, Research engineer Choi, HyoungMun

Place of measurement : Visionox (Guangzhou)

Equipment Model: THERMO SCIENTIFIC-HELIOS 5 CX

측정 조건 및 결과

측정 결과 요약

Test Condition2 Hz5 Hz10 Hz
Z-25 dB-30 dB-33 dB
X-36 dB-32 dB-40 dB
Y-34 dB-32 dB-38 dB

Good omnidirectional performance.

MB1000 내부 프로그램 성능 측정 결과

Z axis

X axis

Y axis

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일05-12-2021
태그
DVIA-M Series
Installation Report
Visionox
Guangzhou
DVIA-MB1000
210524R4
Helios 5 CX
Thermo Fisher Scientific