설치 보고서
DVIA-M Series
03-11-2021

CNITECH Qianwan Institute Thermo Fisher Scientific Helios 5 CX DVIA-MB1000 (191219R3-2) — MB1000 P169 worksheet — 2021.03.11

DVIA-M Series
Installation Report
CNITECH
Qianwan Institute
Helios 5 CX
Thermo Fisher Scientific
DVIA-MB1000
MB1000
P169
191219R3-2

CNITECH

CNITECH

(MB1000 P169 191219R3-2)

타겟 장비 사진

현장 확인 항목

Target equipmentHelios 5 CX
Place of installationQianwan Institute
RemarkGood Performance
END USERCNITECH

운영자 및 일정

Operator: Choi, HyoungMun

Date of setup : 21.03.10

Date of reporting : 21.03.11

Date of business trip : 17.12.27~17.12.29

개요

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 21.03.10 (Wed)

Operator: Daeil System, Research engineer Choi, HyoungMun

Place of measurement : Qianwan Institute

Equipment Model: Helios 5 CX

측정 조건 및 결과

측정 결과 요약

Test Condition2 Hz5 Hz10 Hz
Z-24 dB-28 dB-29 dB
X-22 dB-35 dB-25 dB
Y-23 dB-26 dB-23 dB

Good omnidirectional performance.

MB1000 내부 프로그램 성능 측정 결과

Z axis

X axis

Y axis

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일03-11-2021
태그
DVIA-M Series
Installation Report
CNITECH
Qianwan Institute
Helios 5 CX
Thermo Fisher Scientific
DVIA-MB1000
MB1000
P169
191219R3-2