설치 보고서
DVIA-M Series
09-29-2021
Huawei TESCAN Solaris GMH DVIA-M1000 Installation Report (YIMO, MB1000 P249, 210517R4) — 2021.09.29
DVIA-M Series
Installation Report
YIMO
Huawei
TESCAN
Solaris
DVIA-M1000
210517R4
목차
MB1000 P249(210517r4)
대상 장비 및 설치 장소
| Target equipment | Tescan solaris gmh |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | Huawei |
보고 일정
Operator: Kim, Doohyun
Date of setup : 21.09.24
Date of reporting : 21.09.29
Date of business trip : 17.12.27~17.12.29
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.09.24 (FRI)
Operator: Daeil System, Research engineer Kim, Doohyun
Place of measurement : N/A
Equipment Model: Tescan solaris gmh
측정 조건 및 결과
측정 결과 요약
시험 조건
전달률
| Test Condition | Transmissibility | Transmissibility | Transmissibility |
|---|---|---|---|
| 2 Hz | 5 Hz | 10 Hz | |
| Z | -23 dB | -40 dB | -40 dB |
| X | -29 dB | -35 dB | -31 dB |
| Y | -37 dB | -33 dB | -31 dB |
Good omnidirectional performance.
MB1000 내부 프로그램 성능 측정 결과
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일09-29-2021
태그
DVIA-M Series
Installation Report
YIMO
Huawei
TESCAN
Solaris
DVIA-M1000
210517R4


