설치 보고서
DVIA-M Series
06-22-2021
Guangdong Institute for Drug Control Hitachi Regulus 8100 DVIA-M1000 (210415R1) Internal Program — 2021.06.22
DVIA-M Series
Installation Report
YIMO
Guangdong
DVIA-M1000
210415R1
Hitachi
Regulus 8100
Guangdong Institute for Drug Control
목차
(MB1000 210415R1 (P225) Set up)
| Target equipment | Hitachi Regulus 8100 |
|---|---|
| Place of installation | Guangdong Institute For Drug Control |
| Remark | Good Performance |
| END USER | Guangdong Institute For Drug Control |
| Operator: Doohyun Kim | Date of business trip : 17.12.27~17.12.29 |
| Date of setup: 21.06.22 | |
| Date of reporting: 21.06.22 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21. 06. 22. (TUE)
Operator: Daeil System, Research engineer Doohyun Kim
Place of measurement: Guangdong Institute For Drug Control
Equipment Model: Hitachi Regulus 8100
측정 조건 및 결과
측정 결과 요약
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -24 dB | -30 dB | -30 dB |
| X | -21 dB | -32 dB | -35 dB |
| Y | -29 dB | -34 dB | -34 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일06-22-2021
태그
DVIA-M Series
Installation Report
YIMO
Guangdong
DVIA-M1000
210415R1
Hitachi
Regulus 8100
Guangdong Institute for Drug Control


