본문으로 바로가기
설치 보고서
DVIA-M Series
12-24-2020

BOE Tescan solaris X DVIA-MB1000 (201020R2 · P201) Remote tuning — 2020.12.24

DVIA-M Series
Installation Report
DVIA-MB1000
201020R2
P201
BOE
TESCAN
Solaris X
YIMO

(MB1000_201020R2(P201) Set up)

Target equipmentTescan solaris X
Place of installationBOE
RemarkGood Performance
END USERBOE
Operator: Doohyun KimDate of business trip : 17.12.27~17.12.29
Date of setup : 20.12.24Date of reporting : 20.12.24

개요

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 20.12.24 (Thu)

Operator: Daeil System, Research engineer Doohyun Kim

Place of measurement : BOE

Equipment Model: Tescan solaris X

측정 조건 및 결과

측정 결과 요약

2 Hz5 Hz10 Hz
Z-24 dB-20 dB-26 dB
X-28 dB-29 dB-35 dB
Y-20 dB-24 dB-36 dB

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z축

X축

Y축

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일12-24-2020
태그
DVIA-M Series
Installation Report
DVIA-MB1000
201020R2
P201
BOE
TESCAN
Solaris X
YIMO