설치 보고서
DVIA-M Series
12-24-2020
BOE Tescan solaris X DVIA-MB1000 (201020R2 · P201) Remote tuning — 2020.12.24
DVIA-M Series
Installation Report
DVIA-MB1000
201020R2
P201
BOE
TESCAN
Solaris X
YIMO
목차
(MB1000_201020R2(P201) Set up)
| Target equipment | Tescan solaris X |
|---|---|
| Place of installation | BOE |
| Remark | Good Performance |
| END USER | BOE |
| Operator: Doohyun Kim | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.12.24 | Date of reporting : 20.12.24 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.12.24 (Thu)
Operator: Daeil System, Research engineer Doohyun Kim
Place of measurement : BOE
Equipment Model: Tescan solaris X
측정 조건 및 결과
측정 결과 요약
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -24 dB | -20 dB | -26 dB |
| X | -28 dB | -29 dB | -35 dB |
| Y | -20 dB | -24 dB | -36 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일12-24-2020
태그
DVIA-M Series
Installation Report
DVIA-MB1000
201020R2
P201
BOE
TESCAN
Solaris X
YIMO
관련 케이스 스터디

DVIA-M Series
YIMO TESCAN AMBER X FIB-SEM DVIA-MB1000 (250718R1) Installation Report
11-18-2025자세히

DVIA-M Series
YIMO ZEISS CROSSBEAM350 DVIA-MB1000 (210705R1 · MB1000 P244) Internal Program Performance — 2021.11.05
11-05-2021자세히

DVIA-M Series
Shanghai University of Science and Technology TESCAN Mira DVIA-MB1000 (210309R5 · P214) Remote measurement — Internal program plots — 2021.04.30
04-30-2021자세히