본문으로 바로가기
설치 보고서
DVIA-M Series
01-11-2021

Shenzhen Yan Yi New Materials Zeiss Gemini Sigma 300 DVIA-MB1000 (200918R1 · P192) Remote measurement — Internal program plots — 2021.01.11

DVIA-M Series
Installation Report
DVIA-MB1000
200918R1
Zeiss
Gemini sigma300
Shenzhen
YIMO

(MB1000_200918R1P(192) Set up)

Target equipmentGemini sigma300
Place of installationShenzhen, 9F
RemarkGood Performance
END USER深圳市研一新材料有限公司
Operator: Munho NohDate of business trip : 17.12.27~17.12.29
Date of setup : 21.01.11Date of reporting : 21.01.11

개요

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 21.01.11 (MON)

Operator: Daeil System, Research engineer Munho Noh

Place of measurement : Shenzen, 9F

Equipment Model: Gemini sigma300

측정 조건 및 결과

측정 결과 요약

Test Condition

Transmissibility

2 Hz5 Hz10 Hz
Z-21.19 dB-46.47 dB-25.81 dB
X-37.81 dB-32.56 dB-28.73 dB
Y-28.23 dB-35.04 dB-33.75 dB

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z축

X축

Y축

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일01-11-2021
태그
DVIA-M Series
Installation Report
DVIA-MB1000
200918R1
Zeiss
Gemini sigma300
Shenzhen
YIMO