설치 보고서
DVIA-M Series
01-11-2021
Shenzhen Yan Yi New Materials Zeiss Gemini Sigma 300 DVIA-MB1000 (200918R1 · P192) Remote measurement — Internal program plots — 2021.01.11
DVIA-M Series
Installation Report
DVIA-MB1000
200918R1
Zeiss
Gemini sigma300
Shenzhen
YIMO
목차
(MB1000_200918R1P(192) Set up)
| Target equipment | Gemini sigma300 |
|---|---|
| Place of installation | Shenzhen, 9F |
| Remark | Good Performance |
| END USER | 深圳市研一新材料有限公司 |
| Operator: Munho Noh | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 21.01.11 | Date of reporting : 21.01.11 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.01.11 (MON)
Operator: Daeil System, Research engineer Munho Noh
Place of measurement : Shenzen, 9F
Equipment Model: Gemini sigma300
측정 조건 및 결과
측정 결과 요약
Test Condition
Transmissibility
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -21.19 dB | -46.47 dB | -25.81 dB |
| X | -37.81 dB | -32.56 dB | -28.73 dB |
| Y | -28.23 dB | -35.04 dB | -33.75 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일01-11-2021
태그
DVIA-M Series
Installation Report
DVIA-MB1000
200918R1
Zeiss
Gemini sigma300
Shenzhen
YIMO


