설치 보고서
DVIA-M Series
07-29-2020
Ziess-Gemini 2 DVIA-MB1000 (P172) Internal program performance — 2020.07.29
DVIA-M Series
Installation Report
DVIA-MB1000
Ziess
Gemini 2
internal program performance
P172
목차
MB1000 P172
| 대상 장비 | Ziess-Gemini 2 |
|---|---|
| 설치 장소 | N/A |
| 비고 | Good Performance |
| END USER | N/A |
| Operator: Choi, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.07.29 | |
| Date of reporting : 20.07.29 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.07.23 (THU),
Operator: Daeil System, Manager HyoungMun, Choi
Place of measurement : N/A
Equipment Model: N/A
Measurement conditions and results
Summary of measurement results
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일07-29-2020
태그
DVIA-M Series
Installation Report
DVIA-MB1000
Ziess
Gemini 2
internal program performance
P172
관련 케이스 스터디

DVIA-M Series
Tier-1 Semiconductor Zeiss Gemini 2 FE-SEM DVIA-MB1000 (231128R4) Installation Report
05-29-2025자세히

DVIA-M Series
YIMO ZEISS Sigma 300 DVIA-MB1000 (P256 / 210604R3) Internal program performance — 2021.11.24
11-24-2021자세히

DVIA-M Series
YIMO THERMO APREO 2S DVIA-MB1000 (P237) Internal program performance — 2021.08.18
08-18-2021자세히