본문으로 바로가기
설치 보고서
DVIA-M Series
07-23-2020

MB1000 P144 (190801R7) worksheet — setup and reporting 2020-07-23

DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P144
190801R7

(MB1000 P144 190801R7)

Target equipmentN/A
Place of installationN/A
RemarkGood Performance
END USERN/A
Operator: Choi, HyoungMunDate of business trip : 17.12.27~17.12.29
Date of setup : 20.07.23
Date of reporting : 20.07.23

개요

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 20.07.23 (THU),

Operator: Daeil System, Manager HyoungMun, Choi

Place of measurement : N/A

Equipment Model: N/A

측정 조건 및 결과

측정 결과 요약

Test conditionZXY
Floor
Above Active

Good omnidirectional performance.

MB1000 내부 프로그램 성능 측정 결과

Z axis

X axis

Y axis

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일07-23-2020
태그
DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P144
190801R7