설치 보고서
DVIA-M Series
07-23-2020
MB1000 P144 (190801R7) worksheet — setup and reporting 2020-07-23
DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P144
190801R7
목차
(MB1000 P144 190801R7)
| Target equipment | N/A |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
| Operator: Choi, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.07.23 | |
| Date of reporting : 20.07.23 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.07.23 (THU),
Operator: Daeil System, Manager HyoungMun, Choi
Place of measurement : N/A
Equipment Model: N/A
측정 조건 및 결과
측정 결과 요약
| Test condition | Z | X | Y |
|---|---|---|---|
| Floor | |||
| Above Active |
Good omnidirectional performance.
MB1000 내부 프로그램 성능 측정 결과
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일07-23-2020
태그
DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P144
190801R7
관련 케이스 스터디

DVIA-M Series
Shanghai Jiaotong University Thermo Fisher Apreo 2S DVIA-MB1000 (210701R6) Installation Report — 2024.07.06
07-06-2024자세히

DVIA-M Series
Omicron STM DVIA-MB1000 (230905R3) MB1000 Internal Program Performance — 2024.01.23 Measurement
07-05-2024자세히

DVIA-M Series
ZEISS Sigma 300 DVIA-MB1000 (210503R7) YIMO internal program — 2022-01-07
01-07-2022자세히