Hitachi Regulus a220 DVIA-ML3000 — MB1000 프로그램 P158 / 191211R2 (보고 2020-06-23)
DVIA-ML Series
Installation Report
Hitachi
DVIA-ML3000
MB1000
P158
191211R2
목차
(MB1000_191211R2 Set up)
| Target equipment | Hitachi Regulus a220 |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
| Operator: Kim, Doohyun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.06.19 | N/A |
| Date of reporting : 20.06.23 | N/A |
Equipment picture
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
측정 일자
Measurement date: 20.06.19 (FRI),
Operator
Operator: Daeil System, Manager Doohyun, Kim
측정 장소
N/A
Equipment Model
Equipment Model: Hitachi Regulus a220
측정 조건 및 결과
측정 결과 요약
| Test Condition | VC-Class Z | VC-Class X | VC-Class Y |
|---|---|---|---|
| Floor | |||
| Above Active |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
작성일06-23-2020
태그
DVIA-ML Series
Installation Report
Hitachi
DVIA-ML3000
MB1000
P158
191211R2
관련 케이스 스터디

DVIA-ML Series
Ansteel Iron and Steel Research Institute Thermo Scientific Talos TEM DVIA-ML3000(251125R4) 설치 보고서
07-23-2026자세히
DVIA-ML Series
Tier-1 Semiconductor 기흥 ZEISS Xradia 520 Versa DVIA-ML3000(260319R2) 설치 보고서
07-14-2026자세히

DVIA-ML Series
광저우 GRG Thermo Fisher Talos TEM DVIA-ML3000(260128R4) 설치 보고서
04-22-2026자세히