설치 보고서
DVIA-M Series
09-11-2020
Baosteel Zhanjiang Zeiss Sigma 300 DVIA-MB1000 (200522R2-4 · P183) Internal program worksheet — 2020.09.11
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
200522R2-4
P183
Zeiss Sigma 300
Baosteel Zhanjiang
Zhanjiang
목차
(MB1000_200522R2-4(P183) Set up)
Target equipment
Zeiss Sigma 300
Place of installation
zhanjiang
Remark
Good Performance
END USER
宝钢湛江
Operator
Munho Noh
Date of setup
Date of setup : 20.09.11
Date of reporting
Date of reporting : 20.09.11
Date of business trip
Date of business trip : 17.12.27~17.12.29
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
측정 일자
Measurement date: 20.09.11 (FRI)
Operator: Daeil System, Research engineer Munho Noh
측정 장소
Place of measurement : zhanjiang
Equipment Model
Equipment Model: Zeiss Sigma 300
측정 조건 및 결과
측정 결과 요약
| 테스트 조건 | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -22.73 dB | -27.31 dB | -29.28 dB |
| X | -23.49 dB | -32.07 dB | -39.31 dB |
| Y | -22.31 dB | -33.42 dB | -31.91 dB |
Good omnidirectional performance.
MB1000 내부 프로그램 성능 측정 결과
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일09-11-2020
태그
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
200522R2-4
P183
Zeiss Sigma 300
Baosteel Zhanjiang
Zhanjiang
관련 케이스 스터디

DVIA-M Series
YIMO FEI Apreo C DVIA-MB1000 (P162 / 200414R1) Internal program performance — 2020.09.18
09-18-2020자세히

DVIA-M Series
YIMO Ningde era Thermo Fisher Apreo 2S DVIA-MB1000 (240103R5) Installation Report
05-11-2026자세히

DVIA-M Series
YIMO Allide (Shanghai) Hitachi SU8600 FE-SEM DVIA-MB1000 (240103R6) Installation Report
05-11-2026자세히