설치 보고서
DVIA-ULF Series
10-08-2020
Lattice Semiconductor Phils ZEISS EVO 18 DVIA-U1000 (200203R4 · P15) Remote tuning — Philippines — 2020.10.08
DVIA-U Series
Installation Report
Lattice Semiconductor
Philippines
Zeiss
EVO 18
DVIA-U1000
200203R4
YIMO
remote tuning
목차
Lattice Semiconductor Phils
Lattice Semiconductor Phils
(UB1000_200203R4(P15) Set up)
현장 확인 항목
| Target equipment | Zeiss EVO 18 |
|---|---|
| Place of installation | Aeon Center, Filinvest, Alabang, Muntinlupa, Philippines |
| Remark | Good Performance |
| END USER | Lattice Semiconductor Phils |
운영자 및 일정
| Operator: Munho Noh Date of setup : 20.10.08Date of reporting : 20.10.08 | Date of business trip : 17.12.27~17.12.29 |
|---|
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.10.08 (THU)
Operator: Daeil System, Research engineer Munho Noh
Place of measurement : Aeon Center
Equipment Model: Zeiss EVO 18
측정 조건 및 결과
측정 결과 요약
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -40.0 dB | -25.75 dB | -32.32 dB |
| X | -5.38 dB | -20.86 dB | -26.61 dB |
| Y | -6.94 dB | -23.34 dB | -26.98 dB |
Good omnidirectional performance.
UB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-ULF Series
작성일10-08-2020
태그
DVIA-U Series
Installation Report
Lattice Semiconductor
Philippines
Zeiss
EVO 18
DVIA-U1000
200203R4
YIMO
remote tuning
관련 케이스 스터디
DVIA-ULF Series
Lattice Semiconductor Phils ZEISS SEM EVO18 DVIA-U1000 (200203R4) Inspection Report — Philippines — 2024.02
02-26-2024자세히

DVIA-ULF Series
YIMO DVIA-UD350 (210929R1, P26) OLIMPUS remote tuning worksheet — UD350 internal Z / X / Y program plots
05-26-2026자세히

DVIA-ULF Series
Shanghai Shengjian Environmental System Technology Sigma300 DVIA-U1000 (220919R7) Installation Report — Shanghai
03-10-2023자세히