OMYA ZEISS Gemini DVIA-M1000(MB1000_P149·190816R4) 설치 보고서 — 2020.01.15
DVIA-M Series
Installation Report
OMYA
ZEISS
Gemini
DVIA-M1000
MB1000_P149
190816R4
목차
OMYA
(MB1000_ 190816R4 Set up)
설치 현장 사진
| Target equipment | ZEISS-GEMINI |
|---|---|
| Place of installation | F1, OMYA |
| Remark | Good Performance |
| END USER | OMYA |
Operator: Choi, Hyoung Mun
Date of setup : 20.01.13
Date of reporting : 20.01.15
Date of business trip : 17.12.27~17.12.29
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 2020.01.13 (MON),
Operator: Daeil System, Manager Choi, Hyoung Mun
Place of measurement : F1, OMYA
Equipment Model: ZEISS-GEMINI
측정 조건 및 결과
측정 결과 요약
| 시험 조건 | Z | X | Y |
|---|---|---|---|
| Floor | B | D | E |
| Above Active | G | G | G |
Good omnidirectional performance.
MB1000 internal program performance measurement result
내부 프로그램 Z축
내부 프로그램 X축
내부 프로그램 Y축
Octave Band Result (BASE: Floor, TOP: Above Active)
옥타브 밴드 Z축
옥타브 밴드 X축
옥타브 밴드 Y축
Auto Spectrum (BASE: Floor, TOP: Above Active)
Auto spectrum Z축
Auto spectrum X축
Auto spectrum Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
작성일01-15-2020
태그
DVIA-M Series
Installation Report
OMYA
ZEISS
Gemini
DVIA-M1000
MB1000_P149
190816R4


