본문으로 바로가기
설치 보고서
DVIA-M Series
07-20-2020

天工爱和特钢有限公司 ZEISS EVO MA25 DVIA-MB1000 (191211R2 · P158) Remote measurement — Internal program plots — 2020.07.20

DVIA-M Series
Installation Report
DVIA-MB1000
191211R2
P158
ZEISS
EVO MA25
YIMO

(MB1000_191211R2 Set up)

Target equipmentZEISS EVO MA25
Place of installation天工爱和特钢有限公司
RemarkGood Performance
END USER天工爱和特钢有限公司
Operator: Kim, Doohyun Date of setup : 20.07.20Date of reporting : 20.07.20Date of business trip : 17.12.27~17.12.29

개요

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 20.07.20 (MON),

Operator: Daeil System, Manager Doohyun, Kim

Place of measurement : 天工爱和特钢有限公司

Equipment Model: ZEISS EVO MA25

측정 조건 및 결과

측정 결과 요약

Test Condition

VC-Class

ZXY
Floor
Above Active

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z축

X축

Y축

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일07-20-2020
태그
DVIA-M Series
Installation Report
DVIA-MB1000
191211R2
P158
ZEISS
EVO MA25
YIMO