북경항공항천대학 FEI Scios2 DVIA-MB1000(190925R1 · P143) 원격 성능평가 — 내부 프로그램 플롯 — 2020.08.10
DVIA-M Series
Installation Report
DVIA-MB1000
190925R1
FEI
Scios2
Beijing
YIMO
remote
P143
목차
(MB1000_190925R1(P143) Set up)
| Target equipment | FEI Scios2 |
|---|---|
| Place of installation | Beijing University of Aeronautics and Astronautics, 4th floor |
| Remark | Good Performance |
| END USER | Beijing University |
| Operator: Kim, Doohyun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.08.05. | Date of reporting : 20.08.10 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.08.05 (WED),
Operator: Daeil System, Manager Doohyun, Kim
Place of measurement : Beijing University of Aeronautics and Astronautics 4th floor
Equipment Model: FEI Scios2
측정 조건 및 결과
측정 결과 요약
| Test Condition | VC-Class | ||
|---|---|---|---|
| Z | X | Y | |
| Floor | |||
| Above Active |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
작성일08-10-2020
태그
DVIA-M Series
Installation Report
DVIA-MB1000
190925R1
FEI
Scios2
Beijing
YIMO
remote
P143
관련 케이스 스터디

DVIA-M Series
북경항공항천대학 Thermo scientific Scios 2 DVIA-MB1000(190925R1 · P180) 원격 성능평가 — 내부 프로그램 플롯 — 2020.08.12
08-12-2020자세히

DVIA-M Series
YIMO 원격 튜닝 — 내몽골대학교 Hitachi SU8100 DVIA-MB1000(201216R1-2 · P211) — 2021.06.10
06-10-2021자세히

DVIA-M Series
칭화대학교 Thermo Fisher Scientific Aquilos DVIA-MB1000(201229R2 · P203) 원격 튜닝 워크시트 — 내부 프로그램 플롯 — 2021.03.02
03-02-2021자세히