본문으로 바로가기
설치 보고서
DVIA-M Series
06-27-2019

MFLEX Suzhou ZEISS Sigma500 DVIA-MB1000 (190109R5) Installation worksheet — 2019.06.27

DVIA-M Series
Installation Report
MFLEX
Suzhou
ZEISS
Sigma500
DVIA-MB1000
MB1000
190109R5

MB1000 190109R5 Set up

Target equipment

ZEISS Sigma500

Place of installation

MFLEX Suzhou MFC3, F4

MFLEX Suzhou facility

Remark

Good Performance

END USER

MFLEX

Operator

Operator: Choi, Sung Won

Date of setup

Date of setup : 19.06.25

Date of reporting

Date of reporting : 19.06.27

Date of business trip

Date of business trip : 17.12.27~17.12.29

개요

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

측정 일자

Measurement date: 2019.06.25 (Thursday),

Operator: Daeil System, Manager Sung Won Choi

측정 장소

Place of measurement : 4th Floor, MFLEX

Equipment Model

Equipment Model: ZEISS Sigma500

측정 조건 및 결과

측정 결과 요약

Test ConditionZXY
FloorBCC
Above ActiveEEF

Good omnidirectional performance.

MB1000 internal program performance measurement result

MB1000 internal program — Z axis

MB1000 internal program — X axis

MB1000 internal program — Y axis

Octave Band Result (BASE: Floor, TOP: Above Active)

Octave band — Z axis

Octave band — X axis

Octave band — Y axis

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일06-27-2019
태그
DVIA-M Series
Installation Report
MFLEX
Suzhou
ZEISS
Sigma500
DVIA-MB1000
MB1000
190109R5