설치 보고서
DVIA-M Series
12-03-2018
Shanghai Institute of Materials Research ZEISS Sigma 500 DVIA-MB1000 (MB1000 P64) Internal program worksheet — 2018.12.03
DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P64
ZEISS
Sigma 500
Shanghai
Materials Research
목차
(Shanghai OPTON MB1000_P64 Set up)
Target equipment
ZEISS Sigma 500
Place of installation
institute of materials, 1th FLOOR
Uniqueness
Good Performance
END USER
Shanghai institute of material research
Date of business trip
Date of business trip : 18.11.27
Business traveler
Business traveler: Choi, HyoungMun
Date Created
Date Created : 18.12.03
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
측정 일자
Measurement date: 2018.11.27 (Tuesday),
Rater
Rater: Daeil System, Manager Choi , Hyoung Moon
측정 장소
Place of measurement : institute of materials, 1th FLOOR
Equipment Model
Equipment Model: ZEISS Sigma 500
측정 조건 및 결과
측정 결과 요약
| Test Condition | VC-Class Z | VC-Class X | VC-Class Y |
|---|---|---|---|
| Floor | B | E | E |
| Above Active | F | G | G |
Good omnidirectional performance and attached VC-Class graph.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일12-03-2018
태그
DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P64
ZEISS
Sigma 500
Shanghai
Materials Research
관련 케이스 스터디

DVIA-M Series
Shanghai Institute of Materials Research ZEISS Gemini 500 DVIA-MB1000 (P64) Installation Worksheet — 2017.07.02
07-02-2017자세히

DVIA-M Series
Kolbenscnmidt Shanghai Piston (KSSP) ZEISS EVO18 DVIA-MB1000 (MB1000 P56) China outbound report — 2018.01.02
01-02-2018자세히

DVIA-M Series
KPSNC Shanghai ZEISS EVO18 DVIA-MB1000 (MB1000 P22) China business trip worksheet — 2017.03.20
03-20-2017자세히