본문으로 바로가기
설치 보고서
DVIA-M Series
10-21-2020

Wangxiang ZIESS EVO18 DVIA-MB1000 (170906R4 · P50) Internal program worksheet — 2020.10.21

DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
170906R4
P50
ZIESS
EVO18
Hangzhou
Remote tuning

(MB1000_170906R4(P50) Set up)

Target equipment

ZIESS EVO18

Place of installation

Hangzhou

Remark

Good Performance

END USER

Wangxiang campany

Operator

Operator : Doohyun Kim

Date of setup

Date of setup : 20.10.20

Date of reporting

Date of reporting : 20.10.21

Date of business trip

Date of business trip : 17.12.27~17.12.29

개요

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

측정 일자

Measurement date: 20.10.20 (TUE)

Operator: Daeil System, Research engineer Doohyun kim

측정 장소

Place of measurement : Hangzhou

Equipment Model

Equipment Model: ZIESS EVO18

측정 조건 및 결과

측정 결과 요약

테스트 조건2 Hz5 Hz10 Hz
Z-14 dB-30 dB-30 dB
X-25 dB-25 dB-30 dB
Y-25 dB-30 dB-30 dB

Good omnidirectional performance.

MB1000 내부 프로그램 성능 측정 결과

Z axis

X axis

Y axis

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일10-21-2020
태그
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
170906R4
P50
ZIESS
EVO18
Hangzhou
Remote tuning