설치 보고서
DVIA-M Series
10-21-2020
Wangxiang ZIESS EVO18 DVIA-MB1000 (170906R4 · P50) Internal program worksheet — 2020.10.21
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
170906R4
P50
ZIESS
EVO18
Hangzhou
Remote tuning
목차
(MB1000_170906R4(P50) Set up)
Target equipment
ZIESS EVO18
Place of installation
Hangzhou
Remark
Good Performance
END USER
Wangxiang campany
Operator
Operator : Doohyun Kim
Date of setup
Date of setup : 20.10.20
Date of reporting
Date of reporting : 20.10.21
Date of business trip
Date of business trip : 17.12.27~17.12.29
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
측정 일자
Measurement date: 20.10.20 (TUE)
Operator: Daeil System, Research engineer Doohyun kim
측정 장소
Place of measurement : Hangzhou
Equipment Model
Equipment Model: ZIESS EVO18
측정 조건 및 결과
측정 결과 요약
| 테스트 조건 | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -14 dB | -30 dB | -30 dB |
| X | -25 dB | -25 dB | -30 dB |
| Y | -25 dB | -30 dB | -30 dB |
Good omnidirectional performance.
MB1000 내부 프로그램 성능 측정 결과
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일10-21-2020
태그
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
170906R4
P50
ZIESS
EVO18
Hangzhou
Remote tuning
관련 케이스 스터디

DVIA-M Series
Hangzhou China DVIA-MB1000 (170906R4) Business Trip Report — ZIESS EVO18 Special Edition — 2017.12.08
12-08-2017자세히

DVIA-M Series
Shagang Group ZEISS Crossbeam 550 DVIA-MB1000 (201028R1 · P202, YIMO remote tuning) — 2021.04.12
04-12-2021자세히

DVIA-M Series
Suzhou Weixin Electronics Zeiss Sigma 500 DVIA-MB1000 (190109R5 · P109) Remote tuning — Internal program plots — 2020.08.20
08-20-2020자세히