설치 보고서
DVIA-M Series
09-06-2021
YIMO DVIA-MB3000 (MB3000 P246, 210701R6-5) installation worksheet — 2021.09.06
DVIA-M Series
Installation Report
YIMO
DVIA-MB3000
MB3000 P246
Contents
워크시트
MB3000 P246 210701R6-5
Target equipment
N/A
Place of installation
N/A
Remark
Good Performance
End User
N/A
Operator · setup · reporting
Operator: Choi, HyoungMun Date of setup : 21.08.27 Date of reporting : 21.09.06
Date of business trip
Date of business trip : 17.12.27~17.12.29
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
측정 일자
Measurement date: 21.08.25 (WED) Operator: Daeil System, Research engineer Choi, HyoungMun
측정 장소
N/A
장비 모델
N/A
측정 조건 및 결과
측정 결과 요약
| Test Condition | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -28 dB | -36 dB | -34 dB |
| X | -31 dB | -40 dB | -33 dB |
| Y | -30 dB | -42 dB | -32 dB |
Good omnidirectional performance.
MB3000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일09-06-2021
태그
DVIA-M Series
Installation Report
YIMO
DVIA-MB3000
MB3000 P246
관련 케이스 스터디

DVIA-M Series
Sun Yat-sen University Guangzhou MB3000 P246 DVIA-MB3000 (210701R6-5) internal program — 2021.10.13
10-13-2021자세히

DVIA-M Series
YIMO remote tuning — Mongolia University FEI TF20 DVIA-MB3000 (201216R1-4 P16) — 2021.08.23
08-23-2021자세히

DVIA-M Series
YIMO remote tuning — Inner Mongolia Univ. Talos F200 DVIA-MB3000 (201216R1-5 P17) — 2021.06.09
06-09-2021자세히