설치 보고서
DVIA-M Series
09-10-2024
Zhejiang University Ningbo Thermo Fisher Scientific Talos TEM DVIA-M-THT3 (2405090R7-1) Installation Report
DVIA-M Series
Installation Report
Thermo Fisher Scientific
Talos
TEM
DVIA-M-THT3
2405090R7-1
Ningbo
Zhejiang University
목차
절강대학교 닝보
Zhejiang University Ningbo
(M-THT3\_ 240509R7-1 Set-up)
양식 정보
| Target equipment | Thermo Fisher Scientific Talos |
|---|---|
| Place of installation | Ningbo |
| Remark | Good Performance |
| END USER | Zhejiang University Ningbo |
운영자 및 일정
Operator: Chaewon Lee
Date of setup: 24.09.02
Date of reporting: 24.09.10
Date of business trip : 17.12.27~17.12.29
개요
The DVIA-M-THT3 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2024.09.02(Monday)
Operator: Chaewon Lee from DAEIL SYSTEMS
Place of measurement: Ningbo
Equipment Model:
Manufacturer: Thermo Fisher Scientific
Equipment: TEM
Model: Talos
5.
M-THT3 내부 프로그램 성능 측정 결과
수직
좌우
전후
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일09-10-2024
태그
DVIA-M Series
Installation Report
Thermo Fisher Scientific
Talos
TEM
DVIA-M-THT3
2405090R7-1
Ningbo
Zhejiang University
관련 케이스 스터디

DVIA-M Series
Xiamen Street Lighting Institute Thermo Fisher Scientific Talos DVIA-M-THT3 (240807R5) Internal Program Performance — 2024.12.05
12-05-2024자세히

DVIA-M Series
Xiamen Thermo Fisher Talos DVIA-M-THT3 (240807R5) Installation Report
11-18-2024자세히

DVIA-M Series
Northeastern University Shenyang Thermo Fisher Scientific Talos TEM DVIA-M-THT3 (231129R2-2) Installation Report
07-05-2024자세히