본문으로 바로가기
설치 보고서
DVIA-M Series
11-08-2024

ZEISS Crossbeam 350 FIB-SEM DVIA-M1000 (231219R4) Installation Report

DVIA-M Series
Installation Report
ZEISS
Crossbeam 350
FIB-SEM
DVIA-M1000
231219R4

(M1000_ 231219R4 Set-up)

현장 확인 항목

Target equipmentZEISS Crossbeam350
Place of installationN/A
RemarkGood Performance
END USERN/A

운영자 및 일정

Operator: Chaewon Lee

Date of setup: 24.11.08

Date of reporting: 24.11.11

Date of business trip : 17.12.27~17.12.29

개요

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2024.11.08(Friday)

Operator: Chaewon Lee from DAEIL SYSTEMS

Place of measurement: N/A

Equipment Model: N/A

Manufacturer: ZEISS

Equipment: FIB-SEM

Model: Crossbeam350

5.

M1000 내부 프로그램 성능 측정 결과

Vertical

Left to Right

Front to Back

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일11-08-2024
태그
DVIA-M Series
Installation Report
ZEISS
Crossbeam 350
FIB-SEM
DVIA-M1000
231219R4