현장 확인 항목
| Target equipment | ZEISS Crossbeam350 |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
운영자 및 일정
Operator: Chaewon Lee
Date of setup: 24.11.08
Date of reporting: 24.11.11
Date of business trip : 17.12.27~17.12.29
개요
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2024.11.08(Friday)
Operator: Chaewon Lee from DAEIL SYSTEMS
Place of measurement: N/A
Equipment Model: N/A
Manufacturer: ZEISS
Equipment: FIB-SEM
Model: Crossbeam350
5.
M1000 내부 프로그램 성능 측정 결과
Vertical
Left to Right
Front to Back
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일11-08-2024
태그
DVIA-M Series
Installation Report
ZEISS
Crossbeam 350
FIB-SEM
DVIA-M1000
231219R4
관련 케이스 스터디

DVIA-M Series
Shenghe Jingwei ZEISS Crossbeam 350 FIB-SEM DVIA-M1000 (240409R2) Installation Report
05-11-2026자세히

DVIA-M Series
ZEISS FIB-SEM Crossbeam 350 DVIA-M1000 (250108R5) Installation Report
06-09-2025자세히

DVIA-M Series
ZEISS FIB-SEM Crossbeam 350 DVIA-M1000 (250102R2-3) Installation Report
03-25-2025자세히