본문으로 바로가기
설치 보고서
DVIA-M Series
11-06-2024

Lingyuan Steel ZEISS Sigma360 SEM DVIA-M1000 (231205R3) Installation Report

DVIA-M Series
Installation Report
Lingyuan Steel
YIMO
ZEISS
Sigma360
SEM
DVIA-M1000
231205R3

Lingyuan Steel

Lingyuan Steel

(M1000_ 231205R3 Set-up)

현장 확인 항목

Target equipmentZEISS Sigma360
Place of installationBeijing
RemarkGood Performance
END USERLingyuan Steel

운영자 및 일정

Operator: Chaewon Lee

Date of setup: 24.10.22

Date of reporting: 24.11.06

Date of business trip : 17.12.27~17.12.29

개요

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2024.10.22(Tuesday)

Operator: Chaewon Lee from DAEIL SYSTEMS

Place of measurement: Lingyuan Steel

Equipment Model:

Manufacturer: ZEISS

Equipment: SEM

Model: Sigma360

5.

M1000 내부 프로그램 성능 측정 결과

Vertical

Left to Right

Front to Back

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일11-06-2024
태그
DVIA-M Series
Installation Report
Lingyuan Steel
YIMO
ZEISS
Sigma360
SEM
DVIA-M1000
231205R3