설치 보고서
DVIA-M Series
11-03-2023
Guangdong Jiashang Solaris GMH DVIA-M1000 (230809R2) Installation Report
DVIA-M Series
Installation Report
Guangdong Jiashang
Solaris GMH
DVIA-M1000
230809R2
Dongguan
Contents
Guangdong Jiashang New Energy Tech Co., Ltd.
(M1000_ 230809R2 Set up)
현장 확인 항목
| Target equipment | Solaris GMH |
|---|---|
| Place of installation | Dongguan |
| Remark | Good Performance |
| END USER | Guangdong Jiashang New Energy Tech Co., Ltd. |
운영자 및 일정
Operator: Park, Jongwon
Date of setup: 23.11.02
Date of reporting: 23.11.03
Date of business trip : 17.12.27~17.12.29
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.11.02 (Thursday)
Operator: DAEIL SYSTEMS Jongwon Park
Place of measurement: Dongguan
Equipment Model: Solaris GMH
5.
M1000 내부 프로그램 성능 측정 결과
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일11-03-2023
태그
DVIA-M Series
Installation Report
Guangdong Jiashang
Solaris GMH
DVIA-M1000
230809R2
Dongguan


