설치 보고서
DVIA-M Series
07-05-2024
ZEISS GeminiSEM 360 DVIA-M1000 Internal Performance Report (220603R4, 2024-07-05)
DVIA-M Series
Installation Report
ZEISS
GeminiSEM 360
DVIA-M1000
220603R4
목차
현장 확인 항목
| Target equipment | ZEISS GeminiSEM360 |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
운영자 및 일정
Operator: Chaewon Lee
Date of setup: 23.08.09
Date of reporting: 24.07.05
Date of business trip : 17.12.27~17.12.29
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.08.09(Wednesday)
Operator: Chaewon Lee from DAEIL SYSTEMS
Place of measurement: N/A
Equipment Model: N/A
Manufacturer: ZEISS
Equipment: SEM
Model: GeminiSEM360
5.
M1000 내부 프로그램 성능 측정 결과
Vertical
Left to Right
Front to Back
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일07-05-2024
태그
DVIA-M Series
Installation Report
ZEISS
GeminiSEM 360
DVIA-M1000
220603R4
관련 케이스 스터디

DVIA-M Series
Tianjin Institute of Hematology ZEISS GeminiSEM 360 DVIA-M1000 (250530R5-1) Installation Report
08-25-2025자세히

DVIA-M Series
ZEISS FE-SEM GeminiSEM 360 DVIA-M1000 (241220R2) Installation Report
03-27-2025자세히

DVIA-M Series
Chengdu BYD Semiconductor ZEISS GeminiSEM 360 DVIA-M1000 (231204R5) Internal Program Performance — 2024.07.12
07-12-2024자세히