Sigma300 DVIA-M1000 설치 보고서 (동관, 220118R5, 2022)
DVIA-M Series
Installation Report
DVIA-M1000
DVIA-ML1000
Sigma300
Dongguan
220118R5
END USER
Dongguan Huasheng Vacuum Coating Technology Co., Ltd
M1000_ 220118R5 Set up
설치 사진
Target equipment
Sigma300
Place of installation
Dongguan
Remark
Good Performance
Operator
Lee, Young Ha
Date of setup
22.10.21
Date of reporting
22.11.03
Date of business trip
17.12.27~17.12.29
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
2022.10.21 (Friday)
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement
Dongguan
Equipment Model
Sigma300
M1000 internal program performance measurement result
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
작성일11-03-2022
태그
DVIA-M Series
Installation Report
DVIA-M1000
DVIA-ML1000
Sigma300
Dongguan
220118R5


