설치 보고서
DVIA-M Series
06-24-2022
Zeiss EVO18 DVIA-M1000 (211208R4) Installation Report — Lingyuan Steel, Wuhan
DVIA-M Series
Installation Report
Lingyuan Steel
Wuhan
Zeiss
EVO18
DVIA-M1000
211208R4
목차
고객 및 설치 제목
Lingyuan Iron and Steel Group Co., Ltd
(凌源钢铁)
(M1000_ 211208R4 Set up)
대상 장비 및 설치 장소
| Target equipment | Zeiss EVO18 |
|---|---|
| Place of installation | Wuhan, China |
| Remark | Good Performance |
| END USER | Lingyuan Iron and Steel Group Co., Ltd(凌源钢铁) |
운영자 및 일정
Operator: Lee, Young Ha
Date of setup: 22.06.24
Date of reporting: 22.06.24
Date of business trip : 17.12.27~17.12.29
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.06.24 (Friday),
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: Wuhan, China
Equipment Model: Zeiss EVO18
측정 조건 및 결과
측정 결과 요약
Test Condition
VC-Class
| Z | X | Y | |
|---|---|---|---|
| Floor | B | B | B |
| Above Active | D | E | D |
Good omnidirectional performance.
MB1000 내부 프로그램 성능 측정 결과
MB1000 내부 프로그램 — Z축
MB1000 내부 프로그램 — X축
MB1000 내부 프로그램 — Y축
옥타브 밴드 결과
옥타브 밴드 결과 — Z축
옥타브 밴드 결과 — X축
옥타브 밴드 결과 — Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일06-24-2022
태그
DVIA-M Series
Installation Report
Lingyuan Steel
Wuhan
Zeiss
EVO18
DVIA-M1000
211208R4


