본문으로 바로가기
설치 보고서
DVIA-M Series
06-24-2022

Zeiss EVO18 DVIA-M1000 (211208R4) Installation Report — Lingyuan Steel, Wuhan

DVIA-M Series
Installation Report
Lingyuan Steel
Wuhan
Zeiss
EVO18
DVIA-M1000
211208R4

고객 및 설치 제목

Lingyuan Iron and Steel Group Co., Ltd

(凌源钢铁)

(M1000_ 211208R4 Set up)

대상 장비 및 설치 장소

Target equipmentZeiss EVO18
Place of installationWuhan, China
RemarkGood Performance
END USERLingyuan Iron and Steel Group Co., Ltd(凌源钢铁)

운영자 및 일정

Operator: Lee, Young Ha

Date of setup: 22.06.24

Date of reporting: 22.06.24

Date of business trip : 17.12.27~17.12.29

개요

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2022.06.24 (Friday),

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: Wuhan, China

Equipment Model: Zeiss EVO18

측정 조건 및 결과

측정 결과 요약

Test Condition

VC-Class

ZXY
FloorBBB
Above ActiveDED

Good omnidirectional performance.

MB1000 내부 프로그램 성능 측정 결과

MB1000 내부 프로그램 — Z축

MB1000 내부 프로그램 — X축

MB1000 내부 프로그램 — Y축

옥타브 밴드 결과

옥타브 밴드 결과 — Z축

옥타브 밴드 결과 — X축

옥타브 밴드 결과 — Y축

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일06-24-2022
태그
DVIA-M Series
Installation Report
Lingyuan Steel
Wuhan
Zeiss
EVO18
DVIA-M1000
211208R4