설치 보고서
DVIA-M Series
01-24-2022
Xiamen Farad Electronics Thermo Fisher Apreo 2S DVIA-M1000 MB1000 Worksheet (211206R2) — 2022-01-24
DVIA-M Series
Installation Report
DVIA-M1000
MB1000
Thermo Fisher
Apreo 2S
YIMO
Xiamen Farad Electronics
CABOT
목차
MB1000 P275(211206R2)
MB1000 setup
Target equipment
Thermo Fisher Apreo 2S
Place of installation
CABOT
Remark
Good Performance
END USER
厦门法拉电子
Operator
Operator: Yu, Hosang
Date of setup
Date of setup : 22.01.19
Date of reporting
Date of reporting : 22.01.24
Date of business trip
Date of business trip : 17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 22.01.19 (WED)
Operator: Daeil System, Research engineer Yu, Hosang
Place of measurement : CABOT, 厦门法拉电子
Equipment Model: Thermo Fisher Apreo 2S
Measurement conditions and results
Summary of measurement results
Test Condition
Transmissibility
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -28 dB | -23 dB | -23 dB |
| X | -37 dB | -30 dB | -36dB |
| Y | -27dB | -31 dB | -28 dB |
Good omnidirectional performance.
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일01-24-2022
태그
DVIA-M Series
Installation Report
DVIA-M1000
MB1000
Thermo Fisher
Apreo 2S
YIMO
Xiamen Farad Electronics
CABOT
관련 케이스 스터디

DVIA-M Series
YIMO Changshu Tenglong Special Steel Thermo Fisher Scientific Apreo 2C SEM DVIA-M1000 (240501R9) Installation Report
05-11-2026자세히

DVIA-M Series
YIMO Thermo Fisher Scientific FIB-SEM Apreo 2S DVIA-M1000 (241226R2) Installation Report
04-10-2025자세히

DVIA-M Series
YIMO Thermo Fisher Scientific SEM Apreo 2S DVIA-M1000 (240930R6) Installation Report
03-31-2025자세히