설치 보고서
DVIA-M Series
12-07-2021
Huawei (Hitachi) Hitachi SU8200 DVIA-MB1000 (210601R1 YIMO / P251) Internal Program Performance — Shanghai — 2021.12.07
DVIA-M Series
Installation Report
DVIA-MB1000
Hitachi SU8200
Shanghai
Huawei
YIMO
210601R1
P251
목차
MB1000 P251(210601R1)
| Target equipment | Hitachi su8200 |
|---|---|
| Place of installation | shanghai |
| Remark | Good Performance |
| END USER | 华为(日立) |
| Operator: Kim, Doohyun Date of setup : 21.12.07Date of reporting : 21.12.07 | Date of business trip : 17.12.27~17.12.29 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.12.07 (TUE)
Operator: Daeil System, Research engineer Kim, Doohyun
Place of measurement : shanghai, 华为(日立)
Equipment Model: Hitachi su8200
Measurement conditions and results
Summary of measurement results
| Transmissibility | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -26 dB | -32 dB | -28 dB |
| X | -31 dB | -26 dB | -30 dB |
| Y | -35 dB | -28 dB | -30 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일12-07-2021
태그
DVIA-M Series
Installation Report
DVIA-MB1000
Hitachi SU8200
Shanghai
Huawei
YIMO
210601R1
P251
관련 케이스 스터디

DVIA-M Series
Shanghai University of Science and Technology TESCAN Mira DVIA-MB1000 (210309R5 · P214) Remote measurement — Internal program plots — 2021.04.30
04-30-2021자세히

DVIA-M Series
Kolbenschmidt Shanghai Piston ZEISS evo18 DVIA-MB1000 (P56) Internal program worksheet — 2017.12.27
12-27-2017자세히

DVIA-M Series
ZEISS Sigma 300 VP DVIA-MB1000 (220121R3) Shanghai Installation Report
05-16-2026자세히