설치 보고서
DVIA-M Series
10-28-2021
ZEISS Crossbeam 550 DVIA-MB1000 P228 (210510R5) Internal Program Performance — YIMO — 2021.10.28
DVIA-M Series
Installation Report
YIMO
ZEISS
Crossbeam 550
DVIA-MB1000
P228
210510R5
Hefei
Internal Program
목차
MB1000 P228(210510r5)
| Target equipment | Zeiss Crossbeam550 |
|---|---|
| Place of installation | hefei |
| Remark | Good Performance |
| END USER | Tier-1 Semiconductor |
| Operator: Kim, Doohyun Date of setup : 21.10.28 Date of reporting : 21.10.28 | Date of business trip : 17.12.27~17.12.29 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
측정일
21.10.28 (THU)
운영자
Daeil System, Research engineer Kim, Doohyun
측정 장소
hefei
엔드 유저
Tier-1 Semiconductor
장비 모델
Zeiss Crossbeam550
측정 조건 및 결과
Summary of measurement results
Transmissibility
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -26 dB | -32 dB | -33 dB |
| X | -34 dB | -35 dB | -35 dB |
| Y | -28 dB | -33 dB | -32 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일10-28-2021
태그
DVIA-M Series
Installation Report
YIMO
ZEISS
Crossbeam 550
DVIA-MB1000
P228
210510R5
Hefei
Internal Program
관련 케이스 스터디

DVIA-M Series
ZEISS Crossbeam 550 DVIA-MB1000 P188 (200720R5-3) Internal Program Performance — YIMO — 2021.01.22
01-22-2021자세히

DVIA-M Series
YIMO SILAN ZEISS CROSSBEAN350 MB1000 P250 DVIA-MB1000 Internal Program — SN 210812R2 — 2021.10.28
10-29-2021자세히

DVIA-M Series
Shagang Group ZEISS Crossbeam 550 DVIA-MB1000 (201028R1 · P202, YIMO remote tuning) — 2021.04.12
04-12-2021자세히