설치 보고서
DVIA-M Series
10-05-2020
Schaeffler DVIA-MB1000 (P914, 200730R1) Internal program performance — 2020.10.05
DVIA-M Series
Installation Report
DVIA-MB1000
Schaeffler
internal program performance
P914
200730R1
목차
MB1000 P914
| 대상 장비 | N/A |
|---|---|
| 설치 장소 | N/A |
| 비고 | N/A |
| END USER | N/A |
| Operator: Choim, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.10.05 | |
| Date of reporting : 20.10.05 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.10.05 (MON)
Operator: Daeil System, Research engineer Choi, HyoungMun
Place of measurement : N/A
Equipment Model: N/A
Measurement conditions and results
Summary of measurement results
시험 조건: Transmissibility
| 축 | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -18 dB | -22 dB | -26 dB |
| X | -25 dB | -38 dB | -38 dB |
| Y | -26 dB | -40 dB | -40 dB |
Good omnidirectional performance.
특이사항
필터가 들어갈 시 open loop에 이상 현상 발생 (그래프 출력이 안나옴)
신호가 안 나오다가 시간이 지나면 11개의 신호가 나오기 시작함.(오랜 시간이 필요)
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일10-05-2020
태그
DVIA-M Series
Installation Report
DVIA-MB1000
Schaeffler
internal program performance
P914
200730R1
관련 케이스 스터디

DVIA-M Series
YIMO ZEISS Sigma 300 DVIA-MB1000 (P256 / 210604R3) Internal program performance — 2021.11.24
11-24-2021자세히

DVIA-M Series
YIMO THERMO APREO 2S DVIA-MB1000 (P237) Internal program performance — 2021.08.18
08-18-2021자세히

DVIA-M Series
YIMO DVIA-MB1000 (P160) Internal program performance — 2021.08.04
08-04-2021자세히